Things
continue to go well. Some projects are ahead of schedule, others we have not
been able to start.
The chief
drain on our time is uploading stuff. It is torturously slow on our satellite
hookup, and costs us an estimated 8 man hours a day, 2 hours apiece for 4 crew
members.
Certainly,
if we were ever to deploy a lunar analog station, broadband access would be a
must, even if it means siting the outpost closer to civilization.
It is
beautiful and awesome here, but we have to pay a price for this isolation.
The
Observatory webcam will show the first sections of the simulated pressurized
tunnel we are building between the Hab and the GreenHab already in place - the
framework anyway. It should go faster, now, once the hardest part is done.
Entry
for March 01, 2006
Log Book
for February 28, 2006
Peter
Kokh,commander, Reporting
We made
progress on several fronts today. First, we put up a Moon Flag. It is not a
flag of the Moon, nor the flay of the Moon Society. It is a flag flown by this
crew. Following suite to the Mars tricolor red-green-blue (after Kim Stanley
Robinsion's science fiction trilogy of Red Mars, Green Mars, Blue Mars) we
adopted a tricolor of our own: Gray (for the Moon's surface), Blue for water or
the hydrogen we must scavenge from the soil with which to make it, Green for
the verdant biospheres in which we will live. Right now it is whipping in high
winds. Meanwhile, the Mars flag of our hosts still flies here also, as it
should!
Peter got a
start framing the top of several sections of the simulated pressurized tunnel
we are building between the Mars Hab and the GreenHab. The design has been
approved by the MDRS Engineering Team. You can watch our progress on the
Observatory webcam.
Hugh got a
start on Project Mast, riding with Don Foutz, our agent in Hanksville.
Meanwhile Leslie Wickman joined the crew today and will be working on
monitoring and upgrading the GreenHab water recycling system.
We had our
second EVA today, William and Guido suiting up again for ATV training.
.
Crew
Physical Status: One crew member still has a bad cough, but otherwise we are
all well and happy to be here. We were threatened with rain today, but so far
there has been only a howling wind, strong enough to sandblast exposed tissues,
limiting outside activities and interrupting tunnel construction for now.
Tomorrow
our ongoing projects will continue. Weather permitting, Peter will continue
work on the tunnel project. Leslie will be working in the GreenHab. Other
projects continue indoors.
All
utilities performed perfectly again today, and that conintues to make Steven a
happy camper.
Entry
for February 28, 2006
MoonSkinT
Mechanical Counter-Pressure Suit (Day 02)
Principal
Investigator: William Fung-Schwarz
Crew Health
& Safety Officer, Human Factors Research Lead
William
Fung-Schwarz, was2@utah.edu
Observations:
Today I wore the MoonSkin MCP suit for the first time. The suit specifications
are included in this report. Donning of the suit was incredibly easy. I
substituted a modified knit cap for a neck warmer and substituted this for the
full head MCP hood. The air unit, radio, and other equipment were stored in a
traditional waist bag. Hydration unit tubes and air tubes fit comfortably into
the protective helmet. The air unit was run in intermittent burst (mostly due
to the fact that the system is so loud). Intermittent use was not sufficient to
prevent fogging of inside of helmet. I consumed 2 liters of water during the
1.5 hour excursion. Sweating was a small issue, only light undergarments were
worn beneath the MoonSkin MCP. Elastic neoprene socks allowed for copious pedal
perspiration. A shower after the EVA/Surface Excursion was a very welcome way
to end the trial run.
Project
Goals:
1. Create
a realistic analogue simulation of a Mechanical Counter-Pressure (MCP) suit
[first described by: Webb (1967, 1968); Annis & Webb (1971); Hargens et al.
(1987); Aratow et al. (1993)] and currently being developed by F.A. Korona and
D.L. Akin (at the University of Maryland) and Dava Newman (Massachusetts
Institute of Technology).
2. Collect
descriptive and subjective data from 1-2 users of the MoonSkin MCP bout
comfort, utility of manual dexterity, and temperature of suit.
Suit
Description
1. Body:
Mens 3/2mm Tilos Titanium Skin Chest Full Suit Jumpsuit Wetsuit (Model #J3020,
size 3XL)
2. Hood:
Standard/Unisex 6/3 Scuba Diving, Snorkeling, Water Sports Hood w/Vent (Model
#H6010BK, size XL)
3. Inner
Footwear: NRS HydroSkin® Neoprene Socks (Black, Large, Item 722203)
4. Outer
Footwear: La Sportiva Latok (TRK) Boots (US size 12)
5.
Hydration: Camel Pack Rogue (70 oz/2 litres, Item 720121)
6.
Protection: Black Diamond Bod Climbing Harness (size XL)
7. Helmet:
BMW/Shoei RF-1000 Helmet (large, with clear visor)
8. Forced
Air Apparatus/Ventilation: Coleman Quickpump Rechargeable (Model 5999C400)
Estimated
Suit Cost
1. Body:
$67.99 (purchased from all3sports.com)
2. Hood:
$19.95 (purchased from all3sports.com)
3. Inner
Footwear: $33.00 (purchased from REI)
4. Outer
Footwear: 250.00 (purchased from Campmor.com)
5.
Hydration: $45.00 (purchased from REI)
6.
Protection: $60.00 (purchased from Black Diamond)
7. Helmet:
(borrowed) estimated cost $200.00
8.
Ventilation: $32.00 (purchased from Gart Sports)
Future
Upgrades
1. Helmet:
Reevu Rear-view mirro helmet (http://www.reevu.com/)
2.
Ventilation: 3MT Belt-Mounted Powered Air Purifying Respirator (PAPR)
GVP-Series
Log Book
for February 28, 2006
Peter
Kokh,commander, Reporting
We made
progress on several fronts today. First, we put up a Moon Flag. It is not a
flag of the Moon, nor the flay of the Moon Society. It is a flag flown by this
crew. Following suite to the Mars tricolor red-green-blue (after Kim Stanley
Robinsion's science fiction trilogy of Red Mars, Green Mars, Blue Mars) we
adopted a tricolor of our own: Gray (for the Moon's surface), Blue for water or
the hydrogen we must scavenge from the soil with which to make it, Green for
the verdant biospheres in which we will live. Right now it is whipping in high
winds. Meanwhile, the Mars flag of our hosts still flies here also, as it
should!
Peter got a
start framing the top of several sections of the simulated pressurized tunnel
we are building between the Mars Hab and the GreenHab. The design has been
approved by the MDRS Engineering Team. You can watch our progress on the
Observatory webcam.
Hugh got a
start on Project Mast, riding with Don Foutz, our agent in Hanksville.
Meanwhile Leslie Wickman joined the crew today and will be working on
monitoring and upgrading the GreenHab water recycling system.
We had our
second EVA today, William and Guido suiting up again for ATV training.
.
Crew
Physical Status: One crew member still has a bad cough, but otherwise we are
all well and happy to be here. We were threatened with rain today, but so far
there has been only a howling wind, strong enough to sandblast exposed tissues,
limiting outside activities and interrupting tunnel construction for now.
Tomorrow
our ongoing projects will continue. Weather permitting, Peter will continue
work on the tunnel project. Leslie will be working in the GreenHab. Other
projects continue indoors.
All
utilities performed perfectly again today, and that conintues to make Steven a
happy camper.
Entry
for February 28, 2006
MoonSkinT
Mechanical Counter-Pressure Suit (Day 02)
Principal
Investigator: William Fung-Schwarz
Crew
Health & Safety Officer, Human Factors Research Lead
William
Fung-Schwarz, was2@utah.edu
Observations:
Today I wore the MoonSkin MCP suit for the first time. The suit specifications
are included in this report. Donning of the suit was incredibly easy. I substituted
a modified knit cap for a neck warmer and substituted this for the full head
MCP hood. The air unit, radio, and other equipment were stored in a traditional
waist bag. Hydration unit tubes and air tubes fit comfortably into the
protective helmet. The air unit was run in intermittent burst (mostly due to
the fact that the system is so loud). Intermittent use was not sufficient to
prevent fogging of inside of helmet. I consumed 2 liters of water during the
1.5 hour excursion. Sweating was a small issue, only light undergarments were
worn beneath the MoonSkin MCP. Elastic neoprene socks allowed for copious pedal
perspiration. A shower after the EVA/Surface Excursion was a very welcome way
to end the trial run.
Project
Goals:
1. Create
a realistic analogue simulation of a Mechanical
Counter-Pressure
(MCP) suit [first described by: Webb (1967, 1968); Annis & Webb (1971);
Hargens et al. (1987); Aratow et al. (1993)] and currently being developed by
F.A. Korona and D.L. Akin (at the University of Maryland) and Dava Newman
(Massachusetts Institute of Technology).
2.
Collect descriptive and subjective data from 1-2 users of the MoonSkin MCP bout
comfort, utility of manual dexterity, and temperature of suit.
Suit
Description
1. Body:
Mens 3/2mm Tilos Titanium Skin Chest Full Suit Jumpsuit Wetsuit (Model #J3020,
size 3XL)
2.
Hood: Standard/Unisex 6/3 Scuba Diving, Snorkeling, Water Sports Hood w/Vent
(Model
#H6010BK, size XL)
3.
Inner Footwear: NRS HydroSkin® Neoprene Socks (Black, Large, Item 722203)
4.
Outer Footwear: La Sportiva Latok (TRK) Boots (US size 12)
5.
Hydration: Camel Pack Rogue (70 oz/2 litres, Item 720121)
6.
Protection: Black Diamond Bod Climbing Harness (size XL)
7.
Helmet: BMW/Shoei RF-1000 Helmet (large, with clear visor)
8.
Forced Air Apparatus/Ventilation: Coleman Quickpump Rechargeable (Model
5999C400)
Estimated
Suit Cost
1.
Body: $67.99 (purchased from all3sports.com)
2.
Hood: $19.95 (purchased from all3sports.com)
3.
Inner Footwear: $33.00 (purchased from REI)
4.
Outer Footwear: 250.00 (purchased from Campmor.com)
5.
Hydration: $45.00 (purchased from REI)
6.
Protection: $60.00 (purchased from Black Diamond)
7.
Helmet: (borrowed) estimated cost $200.00
8. Ventilation:
$32.00 (purchased from Gart Sports)
Future
Upgrades
1.
Helmet: Reevu Rear-view mirro helmet (http://www.reevu.com/)
2.
Ventilation: 3MT Belt-Mounted Powered Air Purifying Respirator (PAPR)
GVP-Series
Entry
for February 28, 2006
Artemis Moonbase
Sim 1
MDRS
Crew #45
Peter
Kokh, Commander
Today was
our first full day on Analog Luna. We are now settled in and got a start on
several projects: the Human Factors project (William); the Space Frontier Diet
simulation project (Laurel); Project MAST (Hugh); putting together our sponsors
banner (Peter) and getting our Moon flag ready to put up tomorrow (Peter).
Last
night?s dinner, a vegetable curry with basmati rice, was a clear thumbs up
winner, and will be the first entry in our Space Frontier Cookbook.
We had our
first EVA today! William and Guido suited up today, William in a blue Mars
skinsuit that he had made himself, and Guido in the standard MDRS EVA suit.
Guido our journalist, is a professional and is posting radio and web reports
daily to a number of media. He found today's experience awesome and inspiring
and he was busy writing furiously after his return.
One crew
member has a bad cough, but otherwise we are all well and happy to be here.
Tomorrow our
ongoing projects will continue. W e expect Leslie to arrive by noon and she
will be anxious to get a start on her project monitoring how the GreenHab
recycles graywater from the sinks and showers for reuse in flushing the toilet.
Peter plans to begin assembling the arched top sections for the simulated
pressurized tunnel to connect the GreenHab with the Hab. Getting beyond that
depends on when Don can deliver the 40 PVC pressure pipes that we had on Big
Blue before it died a noble death en route to the Hab from Salt Lake City on
Saturday afternoon.
The sky was
overcast last night at bedtime, but by 3 am every sky in the universe shown out
the commander?s stateroom window. The commander resisted the temptation to
share his excitement with the rest of the busily sleeping crew. The sky
returned to overcast today and tomorrow there is the expectation of rain by
sometime in the afternoon. We hope to get in an EVA before then as the next day
will be a muddy one!
All
utilities performed perfectly today, and that made Steven a happy camper.
Entry for
February 28, 2006
"Denver, we have a problem!"
Today was
supposed to be the first full day of the first Moon Society crew ever at MDRS (temporarily
renamed the Moon Desert Research Station). But in fact, only one crew member,
coming in via Grand Junction, CO arrived yesterday. The five us driving south
from Salt Lake City had a simulated pressurized rover malfunction. The Mars
Society's trusty 1983 Ford Crew Cab pickup, despite obvious signs of mechanical
aches and pains, pushed on valiantly. But then alas, our faithful steed took
its last breath about half way between Price and Green River. We thank it for
picking the one small cellphone hot spot along the way. We were able to call
for help.
Several
people passing by stopped to see if they could be of assistance. Finally, Don
Foutz, our fix-anything can-do agent in Hanksville, arrived. After trouble
shooting battery cables, the oil system and a loose starter, we finally got the
engine to start only to hear the characteristic racket of a bad rod. We waited
a couple of hours more for a tow truck. The crew packed in Don's van and we
followed the tow truck with Blue, finally arriving in Hanksville a bit past 9
pm. A command decision was made to spend the night at the Whispering Sands and
get a good nights sleep before coming out this morning. The alternative would
have been to transfer all the luggage and cargo and to arrive by midnight, maybe.
After
morning showers for all and something to eat, Don drove us out to the Hab about
8 am for our briefing by Crew 44 and the handover of the Hab. We had arrived
with minimal essentials, so while waiting for the rest of our luggage and cargo
to arrive, we held short planning meetings, and took a tour of the facilities
to acquaint first timers with everything. We didn't expect the cargo to arrive
before late evening, but the departing crew pitched in to transfer it from Blue
to a trailer, and it was delivered about 3:30 pm. Thanks to Danielle, John,
Jonathan, and Lealem !!!!
We are all
in good spirits. Tomorrow will be our first full day and we expect to get a
start on our various projects. Meanwhile, for the balance of today, the order
of business is to unpack, have a good meal, settle in, and relax.
Peter
Kokh, Commander
Artemis
Moonbase Sim 1
MDRS
Crew 45
February
26,2006
Entry
for February 25, 2006
". . .
. . . . this is Artemis Control. We've just passed the T-minus 12 hours,
and 5 minute mark in the countdown towards the departure of the Artemis One
crew from the Selene Launching Complex aboard the BIg Blue space to luna
transporter.
At this
time Crew Scientist-Surveyor Hugh S. Gregory, reports a safe arrival at the
Whispering Sands Motel Pressure Dome in Hanksville.
His Earth
to Moon transit aboard the Skyjumper "Anik 21" was uneventful and he
was met at Grand Junction Spaceport by Don Foutz aboard his personal
pressurised moon rover "da van". Hugh reports that going in by Grand Junction has many advantages over going in via the Selene Launching Complex, the two
big advantages were, 1.) no rush hour traffic and 2.) a two hour drive versus a
nearly 5 hours drive.
Mission
Commander Kokh and Crew Nurse Fung-Schwarz completed most of the provision
assembling today. Tomorrow they will greet the final arriving team members and
execute a de-orbit burn on the lunar lander Big Blue to start their descent
into the Artemis One landing site.
All systems
on the Artemis One Hab are reported to be functioning nominally. Next
report when events warrent it. This is Artemis Control.. . . . ."
SpaceBase(tm)(c)
- The Astronomy and Space Sciences
-
Educational Information Service
- Vancouver, Canada
--
Hugh S.
Gregory - Spaceflight Historian
- Chief
Documents Editor for MDRS and FMARS research stations
- Crew
Scientist-Surveyor for MDRS Crew 35, Artemis One Moon Base Sim
MarsCon
2006 - Science Guest of Honour
- Bloomington, MN, USA - March 03-06, 2006
SpaceBase(tm)(c)
- The Astronomy and Space Sciences
-
Educational Information Service
- Vancouver, Canada